20 Monte Kwinter Court Asset Transition Strategy

Purpose supported Fengate in developing an Asset Transition Strategy for this 171 unit, 2021-built midrise rental residential building in Toronto. The Strategy identified near-term efficiency opportunities that address maintenance challenges and pay back in less than 5 years, as well as carbon reduction investments aligned with future equipment renewal. The work included an ASHRAE Level 2 Energy Audit.

Client: Fengate
Location: Toronto

Read More
Building Renewal Purpose Building Building Renewal Purpose Building

WaterPark Place Zero Carbon Pathway

Purpose developed a Zero Carbon Plan for Oxford Properties’ 3-tower, 160,000m2 WaterPark Place complex and continues to support implementation as Owner’s Representative. Purpose evaluated heating plant decarbonization pathways and identified a pathway projected to reduce greenhouse gas emissions by 83% while delivering a $6 million 20-year net present value. Purpose continues to guide technical and commercial decisions, coordinate the project team and support Oxford in advancing the heating plant renewal.

Client: Oxford Properties
Location: Toronto

Read More
Building Renewal Purpose Building Building Renewal Purpose Building

Royal York Hotel Carbon Retrofit

Purpose supported KingSett and Fairmont to renew the heating plant at this 125,000m2 historic Toronto hotel. The resulting program reduced carbon emissions by over 80%. Our support included a facility energy/carbon audit, district energy strategy and heating plant decarbonization analysis, accessing low-interest financing (CIB), IREE certification, energy modeling, and now involves post-retrofit optimization and measurement & verification.

Client: KingSett
Location: Toronto

Read More
Building Renewal Purpose Building Building Renewal Purpose Building

33 Bloor Heating Plant Replacement

Purpose worked with design-builder Kolostat for Epic Investment Services to plan and deliver a low-carbon replacement for the heating system at this 1991-built, 33,000m2 office building in downtown Toronto. Purpose led the transition planning process, creating the business case for 3 replacement options based on cost, emissions reductions and long-term value. The owners selected a hybrid solution combining heat recovery chillers with high-efficiency gas boilers, projected to reduce whole-building greenhouse gas emissions by 56% with a 5.4-year payback on the incremental cost compared with a like-for-similar replacement. Purpose then acted as Owner’s Representative through the Progressive Design-Build process, supporting implementation while Kolostat designed and constructed the project.

Client: Epic Investment Services
Location: Toronto, ON

Read More
Building Renewal Purpose Building Building Renewal Purpose Building

55 University Building Renewal

Purpose supported BGO from strategy through implementation of a multi-year deep retrofit at this 28,000m2 office building in downtown Toronto. Originally constructed in 1977, the building required renewal of its envelope, cooling and heating plants, domestic hot water systems and building controls to address aging equipment while improving tenant comfort, energy performance and long-term asset value. Purpose developed the Zero Carbon Transition Plan, coordinated the design team, and acted as owner’s representative through design, construction and measurement and verification. Integrated analysis of the envelope and mechanical systems led to a pathway projected to reduce building combustion emissions by 98% while avoiding approximately $7 million in capital costs compared with the highest-performance envelope option.

Client: BentallGreenOak